A lot has happened on the house since my last post. As far as the outside goes we have shingles and are just waiting on the siding. On the inside we have the plumbing, wiring, and air conditioner duct work. Once all of this was finished we were at a stand still for about 2 weeks.
They finally showed back up this week and we got insulation and sheet rock.
The kitchen after insulation
The living room after insulation
The duct work in the ceiling for the air conditioner.
Once the sheetrock went in, things really started to look more like our home.
Looking into the dining room from the kitchen.
The kitchen and garage door entrance
Looking into the living room from the kitchen.
Bedroom 1/Playroom
Bedroom 2/Carter's bedroom
Bedroom 3/Natalie's bedroom
Bedroom 4/Master Bedroom
Garage
(They ran out of sheetrock in the garage but that will be finished as well.)
*As of today, the sheet rock has been mudded. Hopefully next week we will have paint on the walls. :)