The future home of the Morrison's
Grading began in May 2014. Daniel's brother Chris did the grading for us.
House pad
Driveway
**Side note-I fell behind on the picture taking. I missed the footing and pouring of the concrete.
After we graded we were kind of at a stand still. They finally came and laid off the house and poured our footing. Then the concrete slab came and we did some more waiting.
Finally on Wednesday July 30 the framers showed up ready to work.
The following pictures were taken after just 3 days worth of work.
Standing in the front door. This will be the living room and the kitchen in the very back.
Standing in the kitchen looking into the dining room.
The hallway off the living room headed toward the bedrooms.
The back of the house.